Planner at a permit counter marking up a site plan against a zoning map, used to illustrate where a review round is actually decided before an application moves to the next desk
LAND USE REVIEW

Zoning permitting software that shows exactly whose desk an application is sitting on

A zoning permitting workflow is the route an application takes from intake to decision: zoning review, plan review, referrals out to fire, water and engineering, corrections back to the applicant, and the permit itself. The Census Bureau counts about 19,900 permit issuing places in the United States and each one runs that route its own way. Neurobird holds the application, the review clock and every correction round on one record.

19,900US permit issuing places
90 daysbefore an unstarted permit voids
150 pagesfederal cap on an impact statement
Where the clock really runs: the referral that left the building and has not come back yet.

Neurobird Zoning Permitting Workflow in short

  • Route an application through zoning, building, fire and engineering and show where it is stopped
  • Hold every correction letter and resubmittal against the round that produced it
  • Run the review clock in working days, including time the file spends out on referral
  • 19,900 Permit issuing places in the Census Bureau's building permits universe as of January 2023, replacing a fixed universe of about 20,100 used from 2014. US Census Bureau, Building Permits Survey definitions
  • 1959 Permit data has been collected monthly and annually on that universe since 1959, which makes it the longest running local construction measure in the country. US Census Bureau, Building Permits Survey
  • Pricing runs 249 to 1400 US dollars per month across 3 tiers. Early access is free.
The daily reality

What planning and permitting departments actually deal with

An applicant calls to ask where the case is and three people give three different answers.
Corrections go out by email and come back as attachments, so nobody can say which set the reviewer signed.
A referral leaves for fire or engineering and the review clock keeps running while it is gone.

Why it stays broken

A zoning case touches planning, building, fire, engineering and sometimes a hearing body, and each of those keeps its own list. The clock belongs to the jurisdiction but the work sits in five inboxes. With about 19,900 permit issuing places in the country, no vendor is going to model all of them, so most counters run the route on email and a spreadsheet.

The Census Bureau's building permits universe held roughly 19,900 permit issuing places as of January 2023, each with its own review route.

NEPA requires federal agencies to assess the environmental effects of their proposed actions prior to making decisions.

epa.gov, source
What it does

Neurobird Zoning Permitting Workflow Compliance Platform

One record per application: the zoning district, every review round, each correction with the reviewer who wrote it, the referrals out and back, and the working days on the clock.

  • 1Route an application through zoning, building, fire and engineering and show where it is stopped
  • 2Hold every correction letter and resubmittal against the round that produced it
  • 3Run the review clock in working days, including time the file spends out on referral
  • 4Give the applicant one status page they can read without phoning the counter

What changes with Neurobird Zoning Permitting Workflow?

The same work, read left to right: how it runs today, and how it runs once the record is in one place.

Zoning permitting workflow: current practice compared with Neurobird Zoning Permitting Workflow
TodayWith Neurobird Zoning Permitting Workflow
An applicant calls to ask where the case is and three people give three different answersRoute an application through zoning, building, fire and engineering and show where it is stopped
Corrections go out by email and come back as attachments, so nobody can say which set the reviewer signedHold every correction letter and resubmittal against the round that produced it
A referral leaves for fire or engineering and the review clock keeps running while it is goneRun the review clock in working days, including time the file spends out on referral

Who is this for?

The same application, three very different counters.

Small jurisdiction

One planner does everything

Intake, zoning review and the referral chase are all the same person. You need the queue written down so a holiday does not stop the counter.

County department

You run several review disciplines

Plan review, fire and engineering each hold the file for a while. You need the handoffs timed rather than assumed.

Development services

You publish cycle times

A published turnaround has to survive an audit. You need the number to trace back to the applications underneath it.

What the numbers say about permit review

Federal counts of permit issuing places, statutory limits on environmental review, and the local rules that void a permit.

19,900

Permit issuing places in the Census Bureau's building permits universe as of January 2023, replacing a fixed universe of about 20,100 used from 2014.

US Census Bureau, Building Permits Survey definitions
1959

Permit data has been collected monthly and annually on that universe since 1959, which makes it the longest running local construction measure in the country.

US Census Bureau, Building Permits Survey
150 pages

Statutory ceiling on an environmental impact statement, not counting citations or appendices, with 75 pages the ceiling for an environmental assessment.

42 USC 4336a
2 years

The deadline for completing an environmental impact statement, and 1 year for an environmental assessment, measured from the trigger set out in the statute.

42 USC 4336a
90 days

The window agencies were given to adopt the federal permitting data and technology standard after the Permitting Technology Action Plan was issued.

Council on Environmental Quality, Permitting Innovation Center
90 days

How long a Long Beach building permit stays alive before it becomes null and void if the authorised work has not commenced or is left suspended.

City of Long Beach, building permits

How does Neurobird Zoning Permitting Workflow work?

  1. Intake once

    Parcel, zoning district, applicant and scope are captured at intake and never retyped into a second log by a second person.

  2. Route and clock

    Each review is a step with an owner and a due date, and the days a file spends out on referral are counted against the same clock everyone quotes.

  3. Close the round

    A correction letter, the resubmittal that answers it and the reviewer's decision stay together, so approval is a record rather than a recollection.

Interactive preview

The queue, as your counter would run it

Tick a review to close it and watch the application move to the next desk with the clock intact.

neurobird / permit review queue
3 / 5
requirements current
RequirementStatusNext due
ZON-2611, rear setback variance, 14 Alder Stcurrentin 42d
SPR-2384, site plan review, Fairfield industrial parkdue soonin 9d
BLD-2907, change of use to restaurant, 220 Maincurrentin 120d
CUP-2455, conditional use, self storage on Route 9overdue3d late
CUP-2455, conditional use, self storage on Route 9currentin 64d

Tick a requirement to file evidence against it.

Zoning permitting workflow software questions, answered

Key terms

What is a zoning permitting workflow?
It is the route an application takes from intake to decision, including zoning review, plan review, referrals to other departments, corrections and issuance. The Census Bureau counts about 19,900 permit issuing places, and each writes that route locally, which is why two neighbouring towns rarely run the same one.

Does this replace our permitting system of record?

No. It sits beside it. The system of record holds fees and the issued permit. This holds the route, the review rounds and the days on the clock, which is the part staff currently reconstruct from email.

How does it handle referrals to other departments?

A referral is a step with an owner and a date, not an email. The file shows it is out, who has it and how long it has been gone, so the clock a resident is quoted matches the clock staff can see.

Can an applicant see status without calling the counter?

Yes. Each application has one status the applicant can read: which review it is in, what correction is outstanding and what happens next. You choose what is published and what stays internal.

Why we are building this

W

e

w

e

n

t

l

o

o

k

i

n

g

f

o

r

t

h

e

w

o

r

k

t

h

a

t

s

t

i

l

l

r

u

n

s

o

n

a

s

h

a

r

e

d

i

n

b

o

x

,

a

n

d

p

e

r

m

i

t

r

e

v

i

e

w

k

e

p

t

c

o

m

i

n

g

u

p

.

T

h

e

c

a

s

e

c

r

o

s

s

e

s

f

o

u

r

d

e

p

a

r

t

m

e

n

t

s

,

t

h

e

c

l

o

c

k

i

s

p

u

b

l

i

c

,

a

n

d

t

h

e

o

n

e

t

h

i

n

g

n

o

b

o

d

y

c

a

n

s

e

e

i

s

w

h

e

r

e

t

h

e

f

i

l

e

a

c

t

u

a

l

l

y

i

s

.

T

h

a

t

i

s

a

r

e

c

o

r

d

p

r

o

b

l

e

m

,

a

n

d

r

e

c

o

r

d

p

r

o

b

l

e

m

s

a

r

e

w

h

a

t

w

e

b

u

i

l

d

.

T

h

e

f

e

d

e

r

a

l

c

o

u

n

t

s

a

n

d

t

h

e

s

t

a

t

u

t

o

r

y

l

i

m

i

t

s

w

e

r

e

a

d

w

h

i

l

e

s

c

o

p

i

n

g

t

h

i

s

a

r

e

l

i

n

k

e

d

a

b

o

v

e

,

s

o

y

o

u

c

a

n

c

h

e

c

k

o

u

r

r

e

a

d

i

n

g

o

f

t

h

e

m

r

a

t

h

e

r

t

h

a

n

t

a

k

e

o

u

r

w

o

r

d

f

o

r

i

t

.

I

f

w

e

h

a

v

e

t

h

e

r

o

u

t

e

w

r

o

n

g

,

t

e

l

l

u

s

a

n

d

w

e

w

i

l

l

f

i

x

i

t

.

Neurobird Team neurobird.com

Where the requirement comes from

Primary sources, straight from the regulators.

How much does Neurobird Zoning Permitting Workflow cost?

Priced per jurisdiction because the code, the districts and the review disciplines are jurisdiction level things. Applications, rounds and applicants are unlimited on every tier.

Small jurisdiction
$249
per month
  • Up to 3 reviewers
  • Unlimited applications
  • Correction rounds
  • Applicant status page
Request early access
Department
$649
per month
  • Unlimited reviewers
  • Referral tracking
  • Working day clock and holidays
  • Cycle time reporting
Request early access
County
$1,400
per month
  • Multiple departments
  • Hearing body calendars
  • Public dashboard exports
  • Priority support
Request early access
Opening 10 early access places for permitting departments.

Get free early access

Early access means we model your review route and your correction letters before you type anything, and you keep the account free while we do it.

Straight answer on where this is: The software is in development. Nothing is purchasable today. Early access means you shape it and pay nothing while we build.

Prefer email? Write to office@neurobird.com and a person will reply. No autoresponder.