Construction dewatering is the removal of groundwater or accumulated water from an excavation so work can continue, and discharging that water needs permit coverage because it carries sediment. Under the 2022 EPA Construction General Permit the turbidity benchmark is 50 Nephelometric Turbidity Units, sampled at least once a day from each discharge point and compared as a weekly average, with results reported quarterly through NeT-CGP. Neurobird keeps the samples, the averages and the corrective actions on one log.

Dewatering pump and filter bags discharging from a construction excavation, illustrating the daily turbidity sampling behind permit compliance
The pump runs all day. The number that matters is the weekly one.
50 NTUthe turbidity benchmark to beat
1 sampleper discharge point, per discharge day
30 daysto report after the quarter closes

Neurobird Construction Dewatering in short

  • Log a turbidity sample per discharge point per discharge day, with time, technician and reading
  • Compute the weekly average against the benchmark as results arrive, not at the end of the quarter
  • Trigger and record corrective action when the weekly average goes over, with the date it was completed
  • 50 NTU The turbidity benchmark threshold under the 2022 Construction General Permit is 50 Nephelometric Turbidity Units unless an alternative benchmark is approved by EPA. US EPA, turbidity benchmark monitoring
  • 1 sample Sites discharging dewatering water to a sediment impaired water, or to a water designated Tier 2, Tier 2.5 or Tier 3, must collect at least one turbidity sample per day from each discharge point on any day there is a dewatering discharge. US EPA, turbidity benchmark monitoring
  • Pricing runs 120 to 560 US dollars per month across 3 tiers. Early access is free.

What dewatering contractors actually deal with

A turbidity sample has to come off every discharge point on every day there is a discharge, and the sheet that records it lives in a truck.
The benchmark is a weekly average, not a single reading, so nobody knows they have exceeded it until somebody does the arithmetic days later.
The quarterly report is due within a fixed window after the quarter ends, and the numbers for it are spread across three months of paper.

Why it stays broken

The obligation is daily and the consequence is weekly, which is exactly the shape paper handles worst. Field sheets record single readings, so the weekly average nobody computed is the number the permit actually judges. By the time the quarterly submission is assembled, the week that went over is two months old and the corrective action window has closed.

A weekly average of 62 NTU against a 50 NTU benchmark is a corrective action, and finding it in October for a July week is a violation.

Report all weekly average turbidity monitoring results on a quarterly basis via NeT-CGP no later than 30 days following the end of each monitoring quarter.

US EPA, turbidity benchmark monitoring for dewatering, source

Neurobird Construction Dewatering Compliance Platform

Log the sample where it is taken and let the average compute itself. The week that is drifting shows up while there is still time to change a filter rather than write an explanation.

  • 1Log a turbidity sample per discharge point per discharge day, with time, technician and reading
  • 2Compute the weekly average against the benchmark as results arrive, not at the end of the quarter
  • 3Trigger and record corrective action when the weekly average goes over, with the date it was completed
  • 4Assemble the quarterly submission from the logs rather than from a stack of field sheets

What changes with Neurobird Construction Dewatering?

The same work, read left to right: how it runs today, and how it runs once the record is in one place.

Construction dewatering: current practice compared with Neurobird Construction Dewatering
TodayWith Neurobird Construction Dewatering
A turbidity sample has to come off every discharge point on every day there is a discharge, and the sheet that records it lives in a truckLog a turbidity sample per discharge point per discharge day, with time, technician and reading
The benchmark is a weekly average, not a single reading, so nobody knows they have exceeded it until somebody does the arithmetic days laterCompute the weekly average against the benchmark as results arrive, not at the end of the quarter
The quarterly report is due within a fixed window after the quarter ends, and the numbers for it are spread across three months of paperTrigger and record corrective action when the weekly average goes over, with the date it was completed

Who is this for?

Same permit, three different jobs.

Specialty dewatering contractor

You own the pumps

You move between sites and inherit somebody else's permit conditions. You need the sampling regime configured per site, not per habit.

Heavy civil general contractor

You hold the permit

The violation lands on you regardless of who ran the pump. You need the weekly average visible while the week is still open.

Environmental consultant

You sign the reports

You assemble the quarterly submission from other people's field sheets. You need the logs to arrive already computed.

How does Neurobird Construction Dewatering work?

  1. Log at the discharge point

    Time, technician, reading and the discharge point, captured on the day the discharge happens, with the rain gauge reading alongside it.

  2. Watch the weekly average

    Readings roll into the weekly average against the benchmark, so an exceedance is visible in the week it occurs rather than at reporting time.

  3. Close the loop

    Corrective action is recorded against the week that triggered it, and the quarterly submission is assembled from the same logs.

What the numbers say about construction dewatering

Useful if you hold permit coverage on an active site. Each figure links back to the permit or rule that set it.

50 NTU

The turbidity benchmark threshold under the 2022 Construction General Permit is 50 Nephelometric Turbidity Units unless an alternative benchmark is approved by EPA.

US EPA, turbidity benchmark monitoring
1 sample

Sites discharging dewatering water to a sediment impaired water, or to a water designated Tier 2, Tier 2.5 or Tier 3, must collect at least one turbidity sample per day from each discharge point on any day there is a dewatering discharge.

US EPA, turbidity benchmark monitoring
30 days

Weekly average turbidity results are reported on a quarterly basis through NeT-CGP no later than 30 days following the end of each monitoring quarter. Exceeding the weekly average benchmark triggers follow up corrective action under CGP Part 5.2.2.

US EPA, turbidity benchmark monitoring
1 acre

A Clean Water Act permit is required for stormwater discharges from construction disturbing 1 acre or more of land, or less than 1 acre where the work is part of a common plan of development that will ultimately disturb 1 or more acres.

US EPA, stormwater discharges from construction activities
1.0 inch

North Carolina's NCG01 general permit requires that when a storm event of 1.0 inch or greater occurs outside normal business hours, the self inspection is performed at the commencement of the next business day, and daily rainfall amounts are part of the inspection record.

NC DEQ, NCG01 inspection and reporting

The site, discharge point by discharge point

A working preview. Tick a discharge point to pull its readings and weekly average.

neurobird / dewatering log
3 / 5
requirements current
RequirementStatusNext due
Weekly average, sediment impaired outfallcurrentin 42d
Discharge point 3, turbidity 38 NTUdue soonin 9d
Quarterly NeT-CGP report duecurrentin 120d
Rain gauge, 1.2 inches overnightoverdue3d late
Corrective action, bag filter changedcurrentin 64d

Tick a requirement to file evidence against it.

Construction dewatering software questions, answered

Key terms

What is construction dewatering?
Construction dewatering is the removal of groundwater or accumulated surface water from an excavation so work can proceed. Because that water usually carries sediment, discharging it needs permit coverage. Under the 2022 EPA Construction General Permit, sites discharging dewatering water to sensitive waters must monitor turbidity against a benchmark.
What is the turbidity benchmark?
The turbidity benchmark under the 2022 Construction General Permit is 50 Nephelometric Turbidity Units, unless EPA approves an alternative. It applies to sites discharging dewatering water to a sediment impaired water or to a water designated as Tier 2, Tier 2.5 or Tier 3.

How often do we sample and report?

Collect at least one turbidity sample per day from each discharge point on any day there is a dewatering discharge, then compare the weekly average against the benchmark. Weekly average results are reported quarterly through NeT-CGP no later than 30 days after the end of each monitoring quarter.

When does a construction site need a permit at all?

A Clean Water Act permit is required for stormwater discharges from any construction activity disturbing 1 acre or more, or less than 1 acre where the work is part of a common plan of development that will ultimately disturb 1 or more acres.

Does this replace our project management system?

No. Schedule, cost and submittals stay where they are. What lives here is the discharge record: samples, weekly averages, rainfall, corrective actions and the report that came out of them.

Why we are building this

Dewatering compliance is a daily task judged on a weekly number and reported on a quarterly clock. Almost every failure we heard about is a gap between those three periods.

The reading gets taken. It just does not turn into an average until the quarter is being written up, and by then the corrective action window has closed.

We would rather build this with people who run the pumps. Tell us how your logs work, and where we have got it wrong.

Neurobird Team neurobird.com

Where the requirement comes from

Public sources on permit coverage, turbidity monitoring and inspection records.

How much does Neurobird Construction Dewatering cost?

Priced per active site because permit coverage is per site. Discharge points, samples and users are unlimited on every tier.

Single site
$120
per site, per month
  • Discharge point logs
  • Daily sample capture
  • Weekly average calculation
  • Rainfall record
  • Email support
Request access
Contractor
$310
per site, per month
  • Everything in Single site
  • Benchmark alerts
  • Corrective action tracking
  • Quarterly report assembly
  • Named contact
Request access
Multi project
$560
per site, per month
  • Everything in Contractor
  • State permit overlays
  • Portfolio roll up
  • Lab result import
  • Onboarding included
Talk to us
First 25 contractors get early access pricing held for three years

Get free early access

If you run dewatering on live sites, tell us how a turbidity reading gets from the pump to the file today.