EU-wide tender · Drywall and interior finishing
Drywall construction work for Building 1B and 3 + Mobile partition wall for Building 3
Original title: Trockenbauarbeiten Haus 1B und 3 + Mobile Trennwand Haus 3
Wanted: Installation of partitioning in Dortmund, North Rhine-Westphalia. The tender is called “Drywall construction work for Building 1B and 3 + Mobile partition wall for Building 3”. Offers are due by Tuesday, 17 November 2026, in 16 days. Procedure: Open procedure, published EU-wide (above the EU thresholds).
- Deadline
- 17 November 2026, 16 days left, 10:00
- Published
- 20 October 2026
- Procedure
- Open procedure
- Notice
- EU-wide (TED)
- Type of contract
- Works
- Estimated value
- not published
- Place of performance
- Dortmund, North Rhine-Westphalia
- Source, last checked
- TED, 1 November 2026
Contracting authority and documents
Contracting authority only with access
Original notice (German)Tender documents on the procurement platformIn short
Drywall construction work for two buildings and a mobile partition wall in Dortmund.
- Work includes Building 1B and Building 3.
- Services include partition walls, ceilings, and doors.
- A mobile partition wall for Building 3 is planned.
- Various ceiling types such as grid ceilings and acoustic ceilings.
- Various sizes for doors with frames.
Summary made from the German notice and checked against it; the German original is authoritative.
What the notice sets
| Duration | 113 days |
|---|---|
| Framework agreement | no |
| Tender validity | 60 days after the deadline |
| Award criteria | price only |
| Suitable for SMEs | not stated |
| Security deposit | not required |
| Legal basis | GWB and VgV (German law implementing the EU directives) |
Worth knowing before you bid
Only the price decides the award. The notice links the tender documents directly. The contract runs for 113 days.
Questions and answers
How much time is left to bid?
Until Tuesday, 17 November 2026, 16 days left. The exact time and how to submit are in the original notice, which is authoritative.
Where is the contract performed?
The place of performance is Dortmund, North Rhine-Westphalia.
In which language are the documents and the offer?
Usually German. The notice states the accepted languages; translations of supporting documents may be requested.
Which rules apply?
German procurement law implementing the EU directives (GWB and VgV; for works VOB/A EU).
Can a company from another EU country bid?
Yes. This tender is published EU-wide, and above the EU thresholds the EU directives guarantee companies from every member state equal treatment. You submit on the platform named in the notice after registering there.
Dates of this tender
| Published | Tuesday, 20 October 2026 |
|---|---|
| Deadline | Tuesday, 17 November 2026, 10:00 |
| Tender validity ends (calculated) | Saturday, 16 January 2027 |
Service by CPV code
- 45421141 Installation of partitioning
- 45421146 Installation of suspended ceilings
More open tenders: Drywall and interior finishing
- Windows, External Doors
Krefelder Bau GmbH
EU-wide (TED) · North Rhine-Westphalia · Open procedureDeadline 2 November 2026, 1 day left
- Metal construction works (windows and doors), new construction of Heide fire station, Märkische Straße 11a, in Bochum
Stadt Bochum, Referat Zentrale Vergabestelle
EU-wide (TED) · North Rhine-Westphalia · Open procedureDeadline 2 November 2026, 1 day left
- Neviandtstraße 87 Nursing Home, Flooring
Stadt Wuppertal
EU-wide (TED) · North Rhine-Westphalia · Open procedureDeadline 2 November 2026, 1 day left
- Drywall construction work, new construction of Fire and Rescue Station II
Contracting authority only with access
EU-wide (TED) · North Rhine-Westphalia · Open procedureDeadline 2 November 2026, 1 day left
Sources
Notice: TED, Amtsblatt der Europäischen Union, retrieved 1 November 2026. All information without guarantee; the original notice is authoritative.