Property manager and a reserve analyst on a condominium roof measuring the remaining life of a membrane, used to show where the numbers in a funding plan are actually decided
COMMON INTEREST FINANCE

Reserve study software that keeps every component, its remaining life and its funding line on one plan

A reserve study is the component inventory and funding plan an association keeps for the assets it will eventually have to replace: roofs, elevators, decks, paving, waterproofing and, in several states now, the structural items named in statute. California requires a visual inspection at least once every three years and a funding plan covering components with a remaining useful life of less than 30 years. Florida requires a structural integrity reserve study at least every 10 years for buildings three habitable stories or higher. Neurobird holds the components, the study and the funding plan on one record.

30 yearsCalifornia remaining life threshold
10 yearsFlorida structural study interval
180 daysto finish phase one of a milestone inspection
Percent funded is not a finance number. It is a roof, a deck and an elevator with dates on them.

Neurobird Reserve Study Capital Planning in short

  • Keep one component inventory that the analyst updates and the board reads, with no second copy
  • Track the study clock for each state rule the association is actually subject to
  • Build the funding plan from the components rather than from last year's number plus inflation
  • 30 years Remaining useful life threshold in California: the study must identify major components below it, estimate their cost and set a funding plan to reach it. California Civil Code 5550
  • 5550 The California code section requiring a visual inspection of accessible major components at least once every three years, reviewed annually, most recently amended by Stats. 2024, Ch. 288. California Civil Code 5550
  • Pricing runs 139 to 1150 US dollars per month across 3 tiers. Early access is free.
The daily reality

What community associations and reserve analysts actually deal with

The component list lives in the analyst's spreadsheet and the board's copy is two studies behind.
Percent funded gets quoted at a meeting from a number nobody can trace back to a component.
A milestone inspection turns up deterioration that was never a line in the reserve plan.

Why it stays broken

A reserve study is prepared by an outside analyst, adopted by a volunteer board, disclosed to owners in an annual summary and now audited against a state statute that changes every session. Each of those four steps keeps its own copy. California made the study a three year obligation reviewed annually, Florida attached it to a structural inspection cycle, and Virginia set five years, so the same association can be measured against three different clocks with the component list still sitting in a spreadsheet.

California Civil Code 5550 requires a visual inspection of major components at least once every three years, with the resulting study reviewed annually by the board.

An officer or a director of an association must sign an affidavit acknowledging receipt of the completed structural integrity reserve study.

Florida Statutes 718.112, condominium bylaws and reserves, source
What it does

Neurobird Reserve Study Capital Planning Client Portal

One record per association: every major component with its remaining useful life and replacement cost, the study that produced those numbers, the funding plan built on them, and the disclosure the owners see.

  • 1Keep one component inventory that the analyst updates and the board reads, with no second copy
  • 2Track the study clock for each state rule the association is actually subject to
  • 3Build the funding plan from the components rather than from last year's number plus inflation
  • 4Produce the owner disclosure straight from the component table it is supposed to summarise

What changes with Neurobird Reserve Study Capital Planning?

The same work, read left to right: how it runs today, and how it runs once the record is in one place.

Reserve study capital planning: current practice compared with Neurobird Reserve Study Capital Planning
TodayWith Neurobird Reserve Study Capital Planning
The component list lives in the analyst's spreadsheet and the board's copy is two studies behindKeep one component inventory that the analyst updates and the board reads, with no second copy
Percent funded gets quoted at a meeting from a number nobody can trace back to a componentTrack the study clock for each state rule the association is actually subject to
A milestone inspection turns up deterioration that was never a line in the reserve planBuild the funding plan from the components rather than from last year's number plus inflation

Who is this for?

The same component table, three different obligations.

Reserve analyst

You produce studies for many associations

Each client has its own components, its own state clock and its own board. You need one inventory per client that survives the next update.

Management company

You carry the disclosure duty

Annual budget packets, percent funded and reserve summaries across a portfolio. You need the numbers to come from the study rather than from a spreadsheet copy.

Self managed board

You are volunteers with a statute to meet

Three year inspections, annual reviews and now structural items named in law. You need the clock to be visible before the deadline, not after it.

How does Neurobird Reserve Study Capital Planning work?

  1. Inventory the components

    Every major component the association must repair or replace, with remaining useful life, current replacement cost and the study date those figures came from.

  2. Run the clock

    Three years in California, five in Virginia, ten for a Florida structural integrity reserve study, with the annual review the board owes on top of whichever applies.

  3. Fund and disclose

    The funding plan and the percent funded figure are computed from the component table, so the disclosure an owner receives traces back to a line rather than to a meeting.

Interactive preview

The component table, as your analyst would keep it

Close a component to see how remaining life and the funding line move together.

neurobird / reserve component register
Harbour Point Owners Associationin progress
  1. Inspection bookedpending
  2. Study issuedpending
  3. Disclosure sentpending
  4. Board reviewpending

Advance a step to see what the client sees.

What the statutes say about reserves

State reserve planning rules, the structural inspection cycles that now sit on top of them, and the disclosure an owner is entitled to receive.

30 years

Remaining useful life threshold in California: the study must identify major components below it, estimate their cost and set a funding plan to reach it.

California Civil Code 5550
5550

The California code section requiring a visual inspection of accessible major components at least once every three years, reviewed annually, most recently amended by Stats. 2024, Ch. 288.

California Civil Code 5550
10 years

Florida interval for a structural integrity reserve study, required for each building on condominium property that is three habitable stories or higher.

Florida Statutes 718.112
30 years

Building age that triggers a Florida milestone inspection, repeated every 10 years, with local agencies allowed to require the first one at 25 years near salt water.

Florida Statutes 553.899
180 days

Time allowed to complete phase one of a milestone inspection after the owners receive written notice, with the association notifying unit owners within 14 days of that notice.

Florida Statutes 553.899
5 years

Virginia interval for a reserve study of capital components, with the results reviewed at least annually and the budget adjusted to match.

Virginia Code 55.1-1965

Reserve study capital planning software questions, answered

Key terms

What is a reserve study?
It is the inventory of major components an association must eventually replace, with each one's remaining useful life and replacement cost, plus a funding plan that says how the money arrives in time. California Civil Code 5550 sets a three year inspection cycle and a 30 year remaining life test for which components must be listed.
What is a structural integrity reserve study?
It is the Florida version aimed at the structure itself rather than at amenities. Florida Statutes 718.112 requires one at least every 10 years for each building on condominium property that is three habitable stories or higher, and reserves for those items can no longer simply be waived.

Does this replace our reserve analyst?

No. The analyst still inspects and sets the numbers. This is where the component table, the study behind it and the funding plan live between studies, so the board is reading the same inventory the analyst updated.

How does it handle several states at once?

The clock is a property of the association, not of the software. A California association gets the three year cycle and the annual review, a Virginia one gets five years, and a Florida building carries the structural study and milestone dates as well.

Can owners see where the percent funded number came from?

Yes. The disclosure is generated from the component table, so each figure traces back to a component, its cost and the study date. You choose what is published and what stays with the board.

Why we are building this

W

e

w

e

n

t

l

o

o

k

i

n

g

f

o

r

r

e

c

o

r

d

s

t

h

a

t

d

e

c

i

d

e

l

a

r

g

e

a

m

o

u

n

t

s

o

f

m

o

n

e

y

a

n

d

s

t

i

l

l

l

i

v

e

i

n

a

s

p

r

e

a

d

s

h

e

e

t

,

a

n

d

r

e

s

e

r

v

e

s

t

u

d

i

e

s

k

e

p

t

c

o

m

i

n

g

u

p

.

T

h

e

s

t

u

d

y

i

s

a

l

e

g

a

l

o

b

l

i

g

a

t

i

o

n

i

n

s

e

v

e

r

a

l

s

t

a

t

e

s

,

t

h

e

f

u

n

d

i

n

g

p

l

a

n

i

s

q

u

o

t

e

d

a

t

e

v

e

r

y

b

o

a

r

d

m

e

e

t

i

n

g

,

a

n

d

t

h

e

c

o

m

p

o

n

e

n

t

t

a

b

l

e

i

t

a

l

l

r

e

s

t

s

o

n

i

s

u

s

u

a

l

l

y

a

f

i

l

e

a

t

t

a

c

h

e

d

t

o

a

n

e

m

a

i

l

f

r

o

m

t

w

o

y

e

a

r

s

a

g

o

.

T

h

a

t

i

s

a

r

e

c

o

r

d

p

r

o

b

l

e

m

,

a

n

d

r

e

c

o

r

d

p

r

o

b

l

e

m

s

a

r

e

w

h

a

t

w

e

b

u

i

l

d

.

T

h

e

s

t

a

t

u

t

e

s

w

e

r

e

a

d

w

h

i

l

e

s

c

o

p

i

n

g

t

h

i

s

a

r

e

l

i

n

k

e

d

a

b

o

v

e

,

s

o

y

o

u

c

a

n

c

h

e

c

k

o

u

r

r

e

a

d

i

n

g

o

f

t

h

e

m

.

I

f

w

e

h

a

v

e

a

s

t

a

t

e

w

r

o

n

g

,

t

e

l

l

u

s

a

n

d

w

e

w

i

l

l

f

i

x

i

t

.

Neurobird Team neurobird.com

Where the requirement comes from

Primary sources, straight from the regulators.

How much does Neurobird Reserve Study Capital Planning cost?

Priced per association or portfolio because the components, the statute and the disclosure duty attach to the association. Components, studies and funding scenarios are unlimited on every tier.

Single association
$139
per month
  • One association
  • Unlimited components
  • Study clock and reminders
  • Owner disclosure export
Request early access
Manager
$495
per month
  • Up to 40 associations
  • Portfolio funding view
  • State rule profiles
  • Board packet builder
Request early access
Analyst firm
$1,150
per month
  • Unlimited clients
  • Study versioning
  • Field inspection capture
  • Priority support
Request early access
Opening 10 early access places for associations and reserve analysts.

Get free early access

Early access means we load your current component table and your state's clock before you type anything, and the account stays free while we do it.

Straight answer on where this is: The software is in development. Nothing is purchasable today. Early access means you shape it and pay nothing while we build.